Closed · F17AS00120 · CFDA 15.658 · Discretionary

Rice Creek Floodplain Restoration Project (Enbridge 2010 Oil Spill Kalamazoo River NRDAR)

Federal grant opportunity posted by Fish and Wildlife Service, cataloged on Grants.gov.

$37K-$37K
Award range
Closed
Status
March 1, 2017
Close date
1
Expected awards

The verdict

Rice Creek Floodplain Restoration Project (Enbridge 2010 Oil Spill Kalamazoo River NRDAR) is a closed discretionary listing from Fish and Wildlife Service that offered $36,650 -- $36,650 across 1 expected award. Future funding cycles may be published under the same CFDA number. PlainGrants indexes 4,242 other opportunities from Fish and Wildlife Service.

$37K-$37K
award range
Closed
application status
1
expected award
15.658
CFDA program

Archived opportunity record

Rice Creek Floodplain Restoration Project is closed (last close March 1, 2017). Check the agency catalog for replacement NOFOs. Fish and Wildlife Service still indexes 4,242 other opportunities here.

According to Grants.gov (extract vintage 2026-08-10), this record reflects the officially published listing. See methodology.

Deadline tracker

Application window closed

Closed March 1, 2017

Posted Feb 22 Closes Mar 1

Est. Total Funding

$36,650

Expected Awards

1

Instrument

Cooperative Agreement

Description

On July 25, 2010, Lakehead Line 6B (Line 6B), a 30-inch diameter pipeline owned and/or operated by Enbridge, Inc., ruptured near Marshall, Michigan, and discharged crude oil into a wetland adjacent to Talmadge Creek, through Talmadge Creek, and into the Kalamazoo River, a Lake Michigan tributary. Oil flowed down the river and into its floodplain for approximately 38 miles, to Morrow Lake. As a consequence, aquatic and floodplain habitats, and species using those habitats, were oiled. The Natural Resource Trustees acting on behalf of the public have finalized a Damage Assessment and Restoration Plan / Environmental Assessment. The Rice Creek Floodplain Restoration Project is among those projects selected by the Trustees to restore resources injured as a result of the discharge of oil into the Kalamazoo River. Rice Creek is a tributary of the Kalamazoo River. This section of Rice Creek was dredged in the past and dredge spoils were mounded along the banks, creating long berms that disconnected the stream from its floodplain. Reconnecting the stream and floodplain allows flood flows to spread out into the floodplain. This reduces water volumes and pressures that could erode stream banks and the bed downstream and allows sediment transported during high flows to settle naturally in the floodplain. The floodplain also provides an area of lower flow rates during floods and can be used by fish and other organisms as a refuge from fast, turbulent flows in the main channel. A previous project removed some of the berm of dredge material from the property, but subsequent monitoring has shown that another 6" of berm should be removed to allow the stream to fully reconnect with the floodplain. Water quality in this stream also affects water quality in the Kalamazoo River downstream. This project will remove an additional 6" of berm along 470' of Rice Creek. This is a notice of intent to award a single source cooperative agreement to Calhoun Conservation District without competition under justification 505DM 2.14.B.2 & 4. The required start date for this cooperative agreement is April 1, 2017 and the project period end date is September 30, 2018. Competition for the award is not practical as the Trustees have conducted a merit review process, documented in the DARP, to identify restoration projects, proposed by potential recipients of restoration funding, to compensate the public for damages to natural resources related to the 2010 Enbridge Oil Spill. In this case, the Trustees have selected a restoration project proposed by the Calhoun Conservation District to compensate the public for damages to natural resources. The Michigan Ecological Services Field Office of the U.S. Fish and Wildlife Service will be substantially involved in the Rice Creek Floodplain Restoration Project under this funding opportunity. In particular, the Service will be responsible for the following: on-site monitoring to document project implementation, monitoring to document ecological outcomes, and development and delivery of outreach materials to communicate to the public, stakeholders, and the Trustees the ecological outcome of restoration.

Catch-all / unrestricted eligibility mark · F17AS00120

Grants.gov marks Rice Creek Floodplain Restoration Project with a catch-all / unrestricted eligibility code (Others (see official listing text)). Read the official announcement text for the real applicant filter — the code alone is not a door list. The extract does not mark applicant cost-sharing as required. Instrument: Cooperative Agreement. Funding-activity codes span Environment · Natural Resources (ENV;NR). 939 other Fish and Wildlife Service listings share this eligibility-code string (22% of 4,243).

Code 25
Others (see official listing text)

Codes are Grants.gov eligibility category values from the extract vintage 2026-08-10. Confirm the full eligibility statement on the official listing or the Grants.gov eligibility reference.

Official Listing on Grants.gov

View full details, application forms, and submission instructions.

View on Grants.gov

Agency Contact

Clark D. McCreedy 517-351-8273 clark_mccreedy@fws.gov

What to do next

Rice Creek Floodplain Restoration Project is closed; use the parent program and agency catalog for the next funding cycle.

  • Browse open federal opportunities in the same category when this listing is closed. Open opportunities
  • Look up CFDA 15.658 across all indexed listings before you commit to this opportunity alone. Eligibility finder
  • Compare award ranges across federal categories before you pick a single CFDA. All categories

Opportunity deadlines and eligibility change on Grants.gov; PlainGrants mirrors the extract and is not the submission system.

Disclaimer: This information is sourced from Grants.gov and SAM.gov and is for informational purposes only. Opportunity details, deadlines, and eligibility requirements change frequently. Always verify current information directly on Grants.gov before applying. PlainGrants is not affiliated with any federal agency.

Data sourced from the SAM.gov Assistance Listings and Grants.gov. See our methodology for details. Retrieved and formatted by PlainGrants