Closed · BOR-MP-17-N011 · CFDA 15.524 · Discretionary
Cachuma Lake Water Transmission Line Project
Federal grant opportunity posted by Bureau of Reclamation, cataloged on Grants.gov.
- $388K-$388K
- Award range
- Closed
- Status
- March 30, 2017
- Close date
- 1
- Expected awards
The verdict
Cachuma Lake Water Transmission Line Project is a closed discretionary listing from Bureau of Reclamation that offered $388,080 -- $388,080 across 1 expected award. Future funding cycles may be published under the same CFDA number. PlainGrants indexes 870 other opportunities from Bureau of Reclamation.
- $388K-$388K
- award range
- Closed
- application status
- 1
- expected award
- 15.524
- CFDA program
Archived opportunity record
Cachuma Lake Water Transmission Line Project is closed (last close March 30, 2017). Check the agency catalog for replacement NOFOs. Bureau of Reclamation still indexes 870 other opportunities here.
According to Grants.gov (extract vintage 2026-08-10), this record reflects the officially published listing. See methodology.
Deadline tracker
Application window closed
Closed March 30, 2017
Est. Total Funding
$388,080
Expected Awards
1
Instrument
Grant
Cost Sharing
Required
Description
On March 14, 2012, Reclamation and the Recipient entered into a long-term (25-year) managing partner Agreement No. 11-LC-20-0223 to administer, operate, maintain, and develop recreation land and facilities within Cachuma Lake. As provided in Public Law 89-72, Reclamation may enter into multi-year agreements for development programs for the design and construction of new Recreation facilities at Lake Cachuma Recreation Area and the upgrade and rehabilitation of existing facilities within the Reservoir Area. The objective as follows: • The main distribution line will be replaced to upgrade the existing fire suppression system, accommodate aging infrastructure, and allow for the future relocation of the water treatment facility. RECIPIENT INVOLVEMENT The Recipient will provide for the administration, operation and maintenance of public use including visitor services, public health and safety, management of recreation use and facilities. The County will hire a contractor to replace the main transmission waterline through the Lake Cachuma Recreation Area. The main distribution line must be replaced to upgrade the existing fire suppression system, accommodate aging infrastructure, and allow for the future relocation of the water treatment facility. RECLAMATION INVOLVEMENT No substantial involvement on the part of Reclamation is anticipated for the successful completion of the objectives to be funded by this award. It is anticipated that Reclamation’s involvement will consist of standard federal stewardship responsibilities such as monitoring project performance, technical assistance at the request of the recipient, etc. SINGLE-SOURCE JUSTIFICATION Reclamation did not solicit full and open competition for this award based the following criteria: (4) UNIQUE QUALIFICATIONS Single Source Justification Description: On March 14, 2012, Reclamation and the Recipient entered into a long-term (25-year) managing partner Agreement No. 11-LC-20-0223 to perform visitor management and recreation activities on Federal lands and waters associated with the Cachuma Project. Per the terms of the managing partner agreement, this Agreement will enable Reclamation and the Recipient to plan for current (land and facility maintenance) and future uses (facility upgrades, deferred maintenance, recreation site improvements) and development of the lands managed by the Recipient, so as to provide for safe and manageable recreation use of Cachuma Lake by the public. The Recipient has been the only managing partner of the Cachuma Lake Recreation Area and has distinct and adequate background to continue in that capacity and to administer financial assistance. STATUTORY AUTHORITY Public Law 89-72, Federal Water Project Recreation Act, July 9, 1965, Section 1, Section 3(b)(1), Section 3(c)(1). Sec. 1. Congressional policy—It is the policy of the Congress and the intent of this Act that (a) in investigating and planning any Federal navigation, flood control, reclamation, hydroelectric, or multiple-purpose water resource project, full consideration shall be given to the opportunities, if any, which the project affords for outdoor recreation and for fish and wildlife enhancement and that, wherever any such project can reasonably serve either or both of these purposes consistently with the provisions of this Act, it shall be constructed, operated, and maintained accordingly: (b) planning with respect to the development of the recreation potential of any such project shall be based on the coordination of the recreational use of the project area with the use of existing and planned Federal, State, or local public recreation developments; and (c) project construction agencies shall encourage non-Federal public bodies to administer project land and water areas for recreation and fish and wildlife enhancement purposes and operate, maintain, and replace facilities provided for those purposes unless such areas or facilities are included or proposed for inclusion within a national recreation area, or are appropriate for administration by a Federal agency as a part of the national forest system, as part of the public lands classified for retention in Federal ownership, or in connection with an authorized Federal program for the conservation and development of fish and wildlife and Sec. 3 (b) (1) If non-Federal public-bodies execute an agreement after initial operation of the project (which agreement shall provide that the non-federal public bodies will administer project land and water areas for recreation or fish and wildlife enhancement or both pursuant to the plan for the development of the project approved by the head of the agency having administrative jurisdiction over it and will bear not less than one-half the costs of lands, facilities, and project modifications provided for recreation, and will bear one-quarter of such costs for fish and wildlife enhancement, and not less than one-half the costs of planning studies, and the costs of operation, maintenance, and replacement attributable thereto) the remainder of the costs of lands, facilities, and project modifications provided pursuant to this paragraph shall be non-reimbursable. and Sec. 3(c) (1) Any recreation facility constructed under this Act may be expanded or modified if (A) the facility is inadequate to meet recreational demand: and (B) a non-Federal public body executes an agreement which provides that such public body- (i) will administer the expanded or modified facilities pursuant to a plan for development for the project that is approved by the agency with administrative jurisdiction over the project; and (ii) will bear not less then one-half of the planning and capital costs of such expansion or modification and no less than one-half of the costs of the operation, maintenance, and replacement attributable to the expansion of the facility. (2) The Federal share of the cost of expanding or modifying a recreational facility described in paragraph (1) may not exceed 50 percent of the total cost of expanding or modifying the facility.
Public-sector applicant lane · Bureau of Reclamation
Grants.gov lists only government / tribal / housing-authority applicant doors for Cachuma Lake Water Transmission Line Project (County governments). This is a public-sector corridor, not a general nonprofit open call. Applicant cost-sharing is required on the Grants.gov extract. Instrument: Grant. Funding-activity code maps to Natural Resources (NR). Only 15 other Bureau of Reclamation listings share this exact eligibility-code string (2% of 871).
- Code 01
- County governments
Codes are Grants.gov eligibility category values from the extract vintage 2026-08-10. Confirm the full eligibility statement on the official listing or the Grants.gov eligibility reference.
Official Listing on Grants.gov
View full details, application forms, and submission instructions.
Agency Contact
Beverly Breen Grants Officer
More from Bureau of Reclamation
Desalination and Water Purification Research Program: Research Projects
WaterSMART Cooperative Watershed Management Program
Native American Affairs: Fiscal Year 2025 Colorado River Basin Tribal Drought Resiliency Program
Title XVI Water Reclamation and Reuse Projects
WaterSMART: Desalination Construction Projects
What to do next
Cachuma Lake Water Transmission Line Project is closed; use the parent program and agency catalog for the next funding cycle.
- Browse open federal opportunities in the same category when this listing is closed. Open opportunities
- Look up CFDA 15.524 across all indexed listings before you commit to this opportunity alone. Eligibility finder
- Compare award ranges across federal categories before you pick a single CFDA. All categories
Opportunity deadlines and eligibility change on Grants.gov; PlainGrants mirrors the extract and is not the submission system.
Disclaimer: This information is sourced from Grants.gov and SAM.gov and is for informational purposes only. Opportunity details, deadlines, and eligibility requirements change frequently. Always verify current information directly on Grants.gov before applying. PlainGrants is not affiliated with any federal agency.
Read our methodology - how this data is sourced, computed, and verified.
| Publisher | PlainGrants |
| Sources | the SAM.gov Assistance Listings and Grants.gov |