Closed · BOR-PN-17-N008 · CFDA 15.560 · Continuation

Lake Roosevelt Model Update (PNW CESU)

Federal grant opportunity posted by Bureau of Reclamation, cataloged on Grants.gov.

$1-$131K
Award range
Closed
Status
August 30, 2017
Close date
-
Expected awards

The verdict

Lake Roosevelt Model Update (PNW CESU) is a closed continuation listing from Bureau of Reclamation that offered $1 -- $130,597. Future funding cycles may be published under the same CFDA number. PlainGrants indexes 870 other opportunities from Bureau of Reclamation.

$1-$131K
award range
Closed
application status
15.560
CFDA program
870
other opportunities from Bureau of Reclamation

Archived opportunity record

Lake Roosevelt Model Update (PNW CESU) is closed (last close August 30, 2017). The parent program page for CFDA 15.560 is the reliable place to catch re-announcements. Bureau of Reclamation still indexes 870 other opportunities here.

According to Grants.gov (extract vintage 2026-08-10), this record reflects the officially published listing. See methodology.

Deadline tracker

Application window closed

Closed August 30, 2017

Posted Aug 16 Closes Aug 30

Est. Total Funding

$130,597

Instrument

Grant

Description

Water temperature and total dissolved gas (TDG) in the Columbia River is strongly influenced by the storage and release of water from projects like Grand Coulee Dam. Previous work has produced a public domain temperature model, known as “CE QUAL-W2”, of Lake Roosevelt for the purpose of informing in-season watershed management decisions to reduce take and to allow the evaluation of various operational and structural alternatives that can influence the regulation of water flow and temperature. CE-QUAL-W2 is a 2-dimensional (longitudinal-vertical) hydrodynamic and water quality model capable of predicting water surface, velocity, temperature, nutrients, multiple algae, zooplankton, periphyton, and macrophyte species, dissolved oxygen, pH, alkalinity, multiple CBOD groups, multiple suspended solids groups, multiple generic constituents (such as tracer, bacteria, toxics), and multiple organic matter groups, both dissolved and particulate. The model is set up to predict these state variables at longitudinal segments and vertical layers. Typical model longitudinal resolution is between 100-1000 m; vertical resolution is usually between 0.5 m and 2 m. The model can also be used in quasi-3-D mode, where embayments are treated as separate model branches off the main stem of the reservoir. The user manual and documentation can be found at our PSU website for the model: http://www.cee.pdx.edu/w2. We have been the primary developing group for this Waterways Experiments Station Corps of Engineers model for the last 10 years. Since 2000, this model has been used extensively throughout the world in 116 different countries. The objective of this project is to improve TDG modeling of Lake Roosevelt using the existing water quality model CE-QUAL-W2 and provide a peer review in a white paper describing temperature regimes and operational influence on release temperatures. Tasks include extending the model downstream six miles to the Hydromet gage near Barry, WA, add three additional simulation years to the model, and to perform analyses that evaluate the sensitivity of model predictions to reaeration, wind, bottom friction, and the upstream boundary. RECIPIENT INVOLVEMENT A repetition of the year-round field sampling and laboratory processing required to complete such a before-after comparison and evaluate the ATP model is necessary. To take full advantage of this opportunity for learning within the adaptive management process, the following objectives must be addressed: 1) complete calculations and analysis of fish production and its trophic basis at the restoration site and other habitats that were not treated, 2) quantify food webs associated with these sites and conduct analyses like those completed in previous study, 3) conduct the BACI analysis to evaluate responses to side channel restoration, and provide key results against which to calibrate the ATP model.

Campus applicant desk · Natural Resources

Grants.gov prints only higher-education applicant doors for Lake Roosevelt Model Update (PNW CESU) (Public / state-controlled institutions of higher education). This reads as a campus competition desk, not a civic or commercial open call. The extract does not mark applicant cost-sharing as required. Instrument: Grant. Funding-activity code maps to Natural Resources (NR). 94 other Bureau of Reclamation listings share this eligibility-code string (11% of 871).

Code 06
Public / state-controlled institutions of higher education

Codes are Grants.gov eligibility category values from the extract vintage 2026-08-10. Confirm the full eligibility statement on the official listing or the Grants.gov eligibility reference.

Official Listing on Grants.gov

View full details, application forms, and submission instructions.

View on Grants.gov

Agency Contact

Melinda Ritacco Lead Grants Management Specialist Phone 208-378-5103

What to do next

Lake Roosevelt Model Update (PNW CESU) is closed; use the parent program and agency catalog for the next funding cycle.

  • Parent CFDA 15.560 may publish future NOFOs under the same assistance listing. Open program
  • Bureau of Land Management Grants indexes 0 Grants.gov listings in this extract. Program profile
  • Bureau of Reclamation lists 870 other indexed opportunities on PlainGrants. Agency catalog

Opportunity deadlines and eligibility change on Grants.gov; PlainGrants mirrors the extract and is not the submission system.

Disclaimer: This information is sourced from Grants.gov and SAM.gov and is for informational purposes only. Opportunity details, deadlines, and eligibility requirements change frequently. Always verify current information directly on Grants.gov before applying. PlainGrants is not affiliated with any federal agency.

Data sourced from the SAM.gov Assistance Listings and Grants.gov. See our methodology for details. Retrieved and formatted by PlainGrants