Closed · N62473-19-2-00004 · CFDA 12.300 · Other

CONJUNCTIVE USE PROJECT ARROYO TOAD CONSERVATION FUND

Federal grant opportunity posted by Naval Facilities Engineering Command Southwest, cataloged on Grants.gov.

up to $2.3M
Award range
Closed
Status
August 7, 2020
Close date
-
Expected awards

The verdict

CONJUNCTIVE USE PROJECT ARROYO TOAD CONSERVATION FUND is a closed other listing from Naval Facilities Engineering Command Southwest that offered Up to $2,316,000. Future funding cycles may be published under the same CFDA number. PlainGrants indexes 15 other opportunities from Naval Facilities Engineering Command Southwest.

up to $2.3M
award range
Closed
application status
12.300
CFDA program
15
other opportunities from Naval Facilities Engineering Command Southwest

Archived opportunity record

CONJUNCTIVE USE PROJECT ARROYO TOAD CONSERVAT… is closed (last close August 7, 2020). Check the agency catalog for replacement NOFOs. Naval Facilities Engineering Command Southwest still indexes 15 other opportunities here.

According to Grants.gov (extract vintage 2026-08-10), this record reflects the officially published listing. See methodology.

Deadline tracker

Application window closed

Closed August 7, 2020

Posted Apr 27 Closes Aug 7

Instrument

Cooperative Agreement

Description

This Cooperative Agreement will address Conservation Measure (CM) 73 of the Biological Opinion (BO) FWS-MCBCP-12B0075-16F0020 associated with the Santa Margarita River (SMR) Conjunctive Use Project (CUP) located on Marine Corps Base Camp Pendleton (MCBCP). The CM identifies the requirement to establish an arroyo toad conservation fund (Fund) in order to conserve and manage at risk properties and their associated breeding habitat for arroyo toad. This Cooperative Agreement will establish a partnership in order to develop and manage the Fund. The BO was developed to address potential environmental impacts of the CUP on MCBCP. The CUP involves the current water extraction system for the southern portion of MCBCP that consists of the diversion of SMR flows via a water diversion structure (weir) with transport of the water via an earthen ditch (O’Neill Ditch) to a series of aquifer recharge (infiltration) ponds and a storage lake (Lake O’Neill). Subsequently, groundwater is extracted from aquifers via a series of wells, treated, and then delivered and used entirely on MCBCP. The current system was determined to be inefficient and requires improvement. The CUP includes construction and operation of new or upgraded water diversion, infiltration, extraction, transport, treatment, and storage infrastructure on MCBCP, Naval Weapons Station Seal Beach Detachment Fallbrook (Det. Fallbrook), and the Fallbrook Public Utilities District (FPUD) service area within the neighboring community of Fallbrook. The action consists of both the construction and long-term operation of the CUP. On 15 August 2016, the United States Department of the Interior, Fish and Wildlife Service (FWS), issued, “Formal Section 7 Consultation on the Conjunctive Use Project (CUP), Marine Corps Base Camp Pendleton (MCBCP), California (FWS-MCBCP-12B0075-16F0020).” This document provides FWS’s Biological Opinion (BO) and is based on information provided in the Final Biological Assessment Santa Margarita River Conjunctive Use Project (Final Revised Biological Assessment) received on 15 September 2015, and correspondence, notes, and information compiled during the course of FWS’s consultation with the MCBCP regarding the CUP. The Final Revised Biological Assessment estimates up to 27.63 acres of arroyo toad (Anaxyrus californicus [Bufo microscaphus c.], ARTO) occupied habitat (1.91 acres of upland habitat and 25.72 acres of riparian habitat) occurs within the CUP construction footprint of the new weir and head gate structure, O’Neill Ditch, and the groundwater collection system. In response to these findings, FWS has provided MCBCP, through the Formal Section 7 Consultation, the requirements to implement various CMs to avoid, minimize, and offset project-related adverse effects to federally listed species, particularly the arroyo toad, within MCBCP and other areas affected by the CUP. This Cooperative Agreement is being established in order to meet the requirements outlined in CM 73 of the BO. CM 73 identifies the need to establish an ARTO Conservation Fund (Fund) in order to conserve and manage at risk properties and their associated breeding habitat for arroyo toad. This Cooperative Agreement will develop a detailed work plan, herein referenced as Execution Plan, which will detail how the funds shall be used to satisfy CM 73. The Execution Plan shall be reviewed and approved by the United States Marine Corps, Carlsbad Fish and Wildlife Office (CFWO), and the Recipient, henceforth known as the Parties.

Catch-all / unrestricted eligibility mark · N62473-19-2-00004

Grants.gov marks CONJUNCTIVE USE PROJECT ARROYO TOAD CONSERVAT… with a catch-all / unrestricted eligibility code (Unrestricted / see official listing). Read the official announcement text for the real applicant filter — the code alone is not a door list. The extract does not mark applicant cost-sharing as required. Instrument: Cooperative Agreement. Funding-activity code maps to Environment (ENV). Inside Naval Facilities Engineering Command Southwest's indexed book this exact eligibility-code string is unique to this listing.

Code 99
Unrestricted / see official listing

Codes are Grants.gov eligibility category values from the extract vintage 2026-08-10. Confirm the full eligibility statement on the official listing or the Grants.gov eligibility reference.

Official Listing on Grants.gov

View full details, application forms, and submission instructions.

View on Grants.gov

Agency Contact

Kellie Wilson Cooperative Agreement Administrator Phone 619-532-2090

What to do next

CONJUNCTIVE USE PROJECT ARROYO TOAD CONSERVAT… is closed; use the parent program and agency catalog for the next funding cycle.

  • Browse open federal opportunities in the same category when this listing is closed. Open opportunities
  • Look up CFDA 12.300 across all indexed listings before you commit to this opportunity alone. Eligibility finder
  • Compare award ranges across federal categories before you pick a single CFDA. All categories

Opportunity deadlines and eligibility change on Grants.gov; PlainGrants mirrors the extract and is not the submission system.

Disclaimer: This information is sourced from Grants.gov and SAM.gov and is for informational purposes only. Opportunity details, deadlines, and eligibility requirements change frequently. Always verify current information directly on Grants.gov before applying. PlainGrants is not affiliated with any federal agency.

Data sourced from the SAM.gov Assistance Listings and Grants.gov. See our methodology for details. Retrieved and formatted by PlainGrants