Closed · F22AS00164 · CFDA 15.654 · Discretionary
Shiawassee NWR Greenpoint Long Pond Wetland Restoration
Federal grant opportunity posted by Fish and Wildlife Service, cataloged on Grants.gov.
- $650K-$756K
- Award range
- Closed
- Status
- March 28, 2022
- Close date
- -
- Expected awards
The verdict
Shiawassee NWR Greenpoint Long Pond Wetland Restoration is a closed discretionary listing from Fish and Wildlife Service that offered $650,000 -- $756,200. Future funding cycles may be published under the same CFDA number. PlainGrants indexes 4,242 other opportunities from Fish and Wildlife Service.
- $650K-$756K
- award range
- Closed
- application status
- 15.654
- CFDA program
- 4,242
- other opportunities from Fish and Wildlife Service
Archived opportunity record
Shiawassee NWR Greenpoint Long Pond Wetland R… is closed (last close March 28, 2022). Check the agency catalog for replacement NOFOs. Fish and Wildlife Service still indexes 4,242 other opportunities here.
According to Grants.gov (extract vintage 2026-08-10), this record reflects the officially published listing. See methodology.
Deadline tracker
Application window closed
Closed March 28, 2022
Est. Total Funding
$756,200
Instrument
Cooperative Agreement
Description
The U.S. Fish and Wildlife Service (Service) at Shiawassee National Wildlife Refuge (NWR) is looking to award one cooperative agreement for engineering, survey, design, and construction management services of the long pond. The long pond is located on the former Germania golf course which is now part of the Refuge. The long pond is a former irrigation pond located near the Tittabawassee River and in it's current condition has steep vertical walls and provides little to no habitat value and poses a safety concern for visitors to the Refuge. The Service seeks to award this cooperative agreement to an entity that can survey they existing pond, develop a restoration design in collaboration with the Service which will connect the long pond to the Tittabawassee River and soften the existing vertical banks of the long pond. Preliminary estimates show that this may require relocating up to 20,000 cubic yards of earth. This site is located within the floodplain of the Tittabawasee River and the design will require direction and oversight from the Service to ensure that the design complies with all State and Federal wetland/floodplain/clean water act permits. The Service has already held pre-appplication meetings with local, State, and Federal regulators to ensure this project is permitable and complient with existing laws. The awardee will provide a complete set of design plans that will be used by the Service to apply for local, State, and Federal permits. Furthermore, this project will involve removal of several miles of asphalt golf cart paths that run throughout the entire former golf course. Once all permits have been issued the awardee will provide construction management to complete the project. Construction management services will include: Development of a federal procurement compliant bid package and solicitation of bids from sub-contractors to complete the work of the long pond and removal of cart paths. Provide construction management, oversight, and on-site inspections of all aspects of construction to ensure all aspects of the project are built to design specifications. Ensure all contractors wash and clean equipment prior to entering Refuge (as outlined in the design plans) to prevent invasive species spread. Ensure all fuel stored on the Refuge by sub-contractors is compliant with the Service policy for fuel storage and containment. Ensure any damage to existing Refuge infrastructure (roads, trails, signs, gates, observation platforms) are repaired to pre-construction condition (this may include but not limited to road grading and dike repair upon completion of the project). Routinely communicate construction activities, timelines, and any issues that may cause delays with the Service program officer. Provide final survey of project to the Service in an ArcGIS and AutoCAD compatible format. The Service will be substantially involved in this project through the following: Provide all local, state, and federal construction and environmental permits. Provide on-site local knowledge of area and conditions. The Service will work with the awardee and subcontractors to develop a timeline for construction activities that considers: wildlife disturbance, flooding and/or changing river levels, daytime and any proposed night time operations (must be approved in advance), and public use (e.g., hiking trails, observation platforms, and any other public use that may be impacted). The Service will approve all haul routes and the Service must approve roads that can be used by awardee and their subcontractor prior to construction, any requests for alternative routes must be approved in advance. Any organization that would like to see the project area in person much contact the Service program officer listed in the NOFO no later than 10 days prior to the closing of the announcement to schedule a site visit.
Multi-door applicant board · 2 Grants.gov types
Grants.gov prints 2 distinct applicant types for Shiawassee NWR Greenpoint Long Pond Wetland R… (Nonprofits with 501(c)(3) status (other than IHEs); Others (see official listing text)). Filter fit against the official announcement before drafting. The extract does not mark applicant cost-sharing as required. Instrument: Cooperative Agreement. Funding-activity code maps to Natural Resources (NR). Only 3 other Fish and Wildlife Service listings share this exact eligibility-code string (0% of 4,243).
- Code 12
- Nonprofits with 501(c)(3) status (other than IHEs)
- Code 25
- Others (see official listing text)
Codes are Grants.gov eligibility category values from the extract vintage 2026-08-10. Confirm the full eligibility statement on the official listing or the Grants.gov eligibility reference.
Official Listing on Grants.gov
View full details, application forms, and submission instructions.
Agency Contact
Eric Dunton Eric_Dunton@fws.gov
More from Fish and Wildlife Service
F27AS00008-NAWCA 2027-1 US Standard Grants
F26AS00051_FY 2026 Competitive State Wildlife Grant (C-SWG) Program_Funding Opportunity Announcement
F26AS00104 State ANS Management Plan 2026
F26AS00040_Fiscal Year 2026_Tribal Wildlife Grants (TWG)_NOFO
F26AS00083 Aquatic Invasive Species Grants to Great Lakes States - Fiscal Year 2026 Great Lakes Restoration Initiative
What to do next
Shiawassee NWR Greenpoint Long Pond Wetland R… is closed; use the parent program and agency catalog for the next funding cycle.
- Browse open federal opportunities in the same category when this listing is closed. Open opportunities
- Look up CFDA 15.654 across all indexed listings before you commit to this opportunity alone. Eligibility finder
- Compare award ranges across federal categories before you pick a single CFDA. All categories
Opportunity deadlines and eligibility change on Grants.gov; PlainGrants mirrors the extract and is not the submission system.
Disclaimer: This information is sourced from Grants.gov and SAM.gov and is for informational purposes only. Opportunity details, deadlines, and eligibility requirements change frequently. Always verify current information directly on Grants.gov before applying. PlainGrants is not affiliated with any federal agency.
Read our methodology - how this data is sourced, computed, and verified.
| Publisher | PlainGrants |
| Sources | the SAM.gov Assistance Listings and Grants.gov |